2024
Inter-City Distribution
Fort St. Phases 5.3-5.5: Installed 4,200' of 24" steel main, 120' of 20" steel main, 2,570' of 16" of steel main, 70' of 8" steel main and 2,000' of 8" plastic main along Fort St. from W. Grand Blvd. to 14th St. and along 14th St. from Fort St. to Bagley St. This project included a 16" and 8" directional drill along 14th St.
District Regulator Installations (Blanket Contract)
1 Mile 30” Take-Up & Relay -- Transmission
2023
Inter-City Distribution
Fort St. Phases 7.2-7.4: Installed 1,230' of 20" steel main, 7100' of 16" steel main, 1,100' of 12" plastic and 7,425' of 8" plastic main on Larned St. and E. Jefferson Ave. from Rivard St. to Station B on E. Jefferson Ave., Detroit. - work continued into 2024
District Regulator Installation (Blanket Contract)
2022
Inter-City Distribution
Grosse Ile Second Feed: Directional drilled approximately 7,700' of 8" steel pipe from Trenton at W. Jefferson to Grosse Ile at the W. River Access Rd. and open cut from drill exit to Meridian Rd.
Fort St. 3.1: Installed approximately 2,800' of 24" steel pipe down Fort St. from Miller Rd. to Woodmere and 1,250' of 12" pipe along Woodmere St. from W. Fort St. to Dearborn St., Detroit.
Fort St. 5.1: Installed approximately 200' of 16" steel pipe along 14th St. to Marantette, Detroit and 350' of 12" steel pipe along Marantette, Detroit
Southfield River Rouge Bore: Installed 2,720' of 24" steel pipe via directional drill along Southfield Freeway under Michigan Ave. and the Rouge River.
Contractor of Choice - Town Border Station Re-Builds
Our Portfolio
Jobs Sites
While the people and equipment have changed over the years, the goal remains the same. Creating a safe work environment
for our employees and the public, while leaving our customer with safe and reliable pipeline.